Step Trutnov was invited to the SME Summit

In November 2012, Step Trutnov was invited to the SME Summit - a top meeting of small and medium enterprises and the European Commission aimed at the European economy, with the key role of these businesses in the renewable energy and employment sector being the main topic.
Read more

Biomass boiler room

The construction of the biomass-fired boiler plant with a boiler for burning whole bales of straw and energy crops at Step TRUTNOV a.s. was completed and put into trial operation in April 2008. The boiler installed was developed by our Company and included in the manufacturing programme for the mean output range 175 ÷ 600 kW.
Read more

Florcenter Olomouc

Stages I. and II. of building biomass boiler room in Flor center Olomouc have been completed. The boiler room is exceptional in that it burns whole packs of straw /with emission limits observed/. Installed boilers are made by the company and they are within the power rating range of 0.68 to 5 MW.
Read more